SAGLIN Machinery — Post-Press Equipment Manufacturer | Five Production Lines, 60+ Countries
SAGLIN Machinery · Established 2014

Post-Press Equipment,
Engineered in China.

Five specialised production lines covering lamination, film laminating, cold foil stamping, window patching, and paper bag production. Delivered turnkey to 60+ countries — with dedicated EAC support for Russia and CIS.

2014est.
Founded
5lines
Production Categories
60+countries
Worldwide Delivery
Ruian, Zhejiang
SAGLIN Machinery post-press equipment manufacturer headquarters in Ruian, Zhejiang
SAGLIN Machinery · Headquarters & production facility
RU

Russia & CIS: HD RUS LLC strategic partner

Local installation, EAC certification support, operator training in Russian, and aftersales service across the Russian Federation and CIS — handled by HD RUS LLC (Khimki, Moscow region).

CE EAC RoHS
About SAGLIN

Five specialised production lines.
One manufacturer.

SAGLIN Machinery is a post-press equipment manufacturer headquartered in Ruian, Zhejiang Province — China’s industrial heartland for packaging and converting machinery. Established in 2014, we engineer and deliver five specialised production lines that serve the most demanding segments of the global packaging industry.

“We engineer post-press equipment for converters who measure their production in two-shift output, not single-job specs.”

Our five production lines — lamination (SAGLIN-DX), film laminating (SAGLIN-MTM), screen finishing lines for cold foil, hologram & spot UV (SAGLIN-GST + GUVY / GUV·IR), window patching (SAGLIN-TC / VCUT), and paper bag production (SAGLIN-RZJD / RZFD) — cover the post-press value chain end-to-end. Each line is built around the same engineering principle: industrial-grade global-brand electrical and pneumatic components, paired with structural design that survives two-shift production for decades.

Every SAGLIN machine ships with electrical and pneumatic specifications adapted for the destination market. For Russia and CIS, this means 380V / 50Hz configuration, EAC certification support, and local installation through our strategic partner HD RUS LLC in the Moscow region — delivering true turnkey installation, not just freight forwarding.

Why converters choose SAGLIN

  • Five specialised production lines under one manufacturer
  • Industrial-grade global-brand electrical & pneumatic components
  • EAC certification & HD RUS turnkey delivery for Russia/CIS
  • 45–60 day lead time · 30%+70% T/T · 12-month warranty
  • Russian-language operator training in Khimki, Moscow region
  • Multi-language project support: EN / RU / ES / ZH
Machines

The SAGLIN production catalogue.

Five specialised lines covering the full post-press value chain. Pick the category that matches your production segment, or combine multiple lines into an integrated finishing operation.

★ Flagship Range SAGLIN-DX-1450 — flagship cardboard lamination machine
DX SERIES

Lamination

Cardboard & corrugated · automatic feeding

Two-stage lamination platform for premium cardboard and corrugated packaging. SAGLIN-DX-1450 large-format flagship plus SAGLIN-DX-1207 mid-format workhorse — together covering 99% of converter demand from gift box to retail carton.

Explore Lamination →
Why SAGLIN

Four reasons buyers commit before factory visit.

What we hear from purchasing managers across 60+ countries — the factors that move SAGLIN from shortlist to signed contract on the same call.

01

Engineered in China

Headquartered in Ruian — China’s converting-machinery heartland. Five specialised production lines under one engineering team, not a trading aggregator.

02

60+ Countries Delivered

Active installations across Russia, CIS, Latin America, the Middle East, Southeast Asia, and Africa — with multi-language project support in EN / RU / ES / ZH.

03

EAC Support for Russia

EAC certification arranged through our strategic partner HD RUS LLC. CE certification from factory. Documentation packs delivered in Russian for customs clearance.

04

Turnkey Local Service

HD RUS LLC in Khimki provides installation, Russian-language operator training, EAC certification, and 24-hour spare parts shipment across the Russian Federation.

Our Production

Industrial-grade assembly. Two-shift output.

“What separates a factory from a workshop is repeatability — the same precision on machine 200 as on machine 1.”

Our production hall is organised around modular assembly cells, each dedicated to a specific machine category. Frame welding, precision machining, electrical assembly, and final commissioning occur in sequence under a single roof — eliminating supply-chain timing risks that delay competitor deliveries.

Every machine receives a 72-hour pre-shipment run-in test under simulated production load. Cold-foil units run real foil rolls. Lamination machines run live cardboard. Window-patching machines run blank-and-film cycles. The result: when the crate opens in Khimki or São Paulo, our engineers commission the machine — they don’t troubleshoot it.

72hours
Pre-Ship Run-In
45–60days
Typical Lead Time
SAGLIN Machinery assembly hall — modular cells for cardboard lamination, window patching, and cold foil stamping equipment
Assembly hall · modular production cells
How We Work

Five steps. One signed contract.

From first inquiry to operator handover — typically 4 to 5 months for a single-machine project, 6 to 7 months for an integrated finishing line.

STEP 01

Inquiry

Tell us your sheet size, production volume, and target processes. We respond within 24 hours in your language.

DAY 0–2
STEP 02

Solution

Detailed quotation, floor-layout drawing, ROI estimate, and EAC documentation plan. Configuration recommended for your packaging mix.

WEEK 1–2
STEP 03

Manufacture

Production begins on 30% deposit. 45–60 days from order to factory acceptance, with 72-hour pre-shipment run-in test under load.

MONTH 2–3
STEP 04

Ship

70% balance before shipment. By vessel on pallets to St. Petersburg, Novorossiysk, Veracruz, or destination port — 35–45 days transit.

MONTH 3–4
STEP 05

Install

Installation by SAGLIN engineers with HD RUS local support. 5-day Russian-language operator training included. 12-month warranty from acceptance.

MONTH 4–5

Ready to talk to engineering?

Tell us your production segment, target output, and destination market. We respond within 24 hours with a configuration recommendation, quotation, and project timeline — in EN, RU, ES, or ZH.